Palm Lake Resort Caloundra Cay

Easy Living Home Elevators partners with Palm Lake Group to incorporate 70 elevators complete with SMARTAFRAME into the exquisite Palm Lake Resort Caloundra Cay, on the Sunshine Coast.

About Project

Elevator

Location

Palm Lake Resort Caloundra Cay

Download Case Study PDF

Description

Easy Living Home Elevators partners with Palm Lake Group to incorporate 70 elevators complete with SMARTAFRAME into the exquisite Palm Lake Resort Caloundra Cay, on the Sunshine Coast.

Project Partners

Palm Lake Group



The Palm Lake Group have been building architecturally designed homes for more than 40 years. Up to now, the vast majority of homes have been two-bedroom single-storey dwellings. However, Caloundra Cay is taking that award-winning design to the next level. Literally! In a first for the Palm Lake Group, Caloundra Cay now offers two-storey home designs complete with an internal elevator as standard.

Key Benefits Delivered

STREAMLINED

Since the SMARTAFRAME system is preassembled in the factory, there is significantly less truck traffic, equipment and material suppliers around the construction site. This streamlined approach to construction provides for more efficient productivity and eliminates unnecessary distractions and interference that are typical of construction sites.

EASE OF INSTALLATION

The SMARTAFRAME system eliminates the problems that can occur when using traditional shaft construction methods such as blockwork which rely heavily on the skills of site labour, require high levels of supervision and are time consuming.

SPEED

The SMARTAFRAME system allows for a significantly shorter on-site construction time frame. This is due to the preassembled, offsite manufacture, ready for delivery and integration into the build. This, combined with the elimination of on-site weather factors and subcontractor scheduling delays, leads to a quick installation.

Keeping the elevator off the critical path that slows progress in the traditional method.

From our very first meeting we knew we had made the right choice in elevator companies. Easy Living Home Elevators worked accurately with our construction programme. The off-site manufacturing and assembly meant that the elevators were completed in parallel with our on-site works. Our project programme was slashed when 8 elevators were installed in one day!

Palm Lake Group

Get The Look

Wall Swatches

Polished

Polished White

Floor Swatches

Owner Supplied

Owner Supplied

Ceiling Swatches

Polished

Polished White

Related Case Studies

Corella Construction
Easy Living Evolution

Corella Construction

St Patrick's Estate
Easy Living Advantage

St Patrick's Estate

Share Project

Make An Enquiry
Schedule A Meeting
  • Preferred Date
    DD slash MM slash YYYY
  • Preferred Time
    :
  • This field is for validation purposes and should be left unchanged.
Call Us Now
  • 24/7 Service Centre
  • Melbourne
  • Sydney
  • Brisbane
  • Perth
  • Adelaide
  • 1800 813 555
  • (03) 9094 8600
  • (02) 8116 1500
  • (07) 3851 7500
  • (08) 6272 9400
  • (08) 9322 4688
  • To find a showroom or submit a full enquiry visit contact us