Works by Others.  

LIFT SHAFT:  Construction of the lift shaft by builder, to Easy Living Home Elevators specifications.

SHAFT WALLS:  Walls to be solid, not hollow, poured concrete,        pre-cast or core filled block is acceptable. (loads are available upon request)
Steel columns approved by your engineer and located as per Easy Living Home Elevators drawing is also acceptable.

PIT:  Lift pit must be kept dry. No seepage or damp areas are allowed.
This is a Work Cover requirement and will affect the long-term condition of the equipment.

SHAFT & PIT FINISH:  A smooth and plumb surface shall be provided. Ensure shaft and pit is dry, stripped, cleaned, holes patched and free of construction debris and formwork nails or other protrusions prior to Easy Living Home Elevators start on site.

Glass Doors:  In addition to the above. If glass doors have been ordered, the inside of the lift shaft is visible from the landing so rendering and/or painting is recommended.
Note: Overall shaft size must be maintained.

DOOR OPENING SIDES:  Lift shaft to be smooth & rendered on door opening side(s).

SHAFT ROOF:  Lift shaft roof must be a solid, non-perforated material, permanently fixed and of sufficient strength to support the weight of a person, nominally 120kg.

SHAFT BARRICADE:  Supply, install and maintain shaft protection barricades to each lift entrance.

SHAFT LIGHTING:  By Easy Living Home Elevators.

SHAFT CONDUIT:  By Easy Living Home Elevators.

MACHINE ROOM:  Construction of the machine room enclosure (if machine room is preferred by the customer) to Easy Living Home Elevators specifications.

MACHINE ROOM DOOR:  If machine room is provided, supply and install fire door with closer and night-type latch to the lift machine room entrance. Minimum door dimension is 900mm x 2000mm clear. The door must open outwards from the lift machine room.

CABINET ACCESS:  A clear permanent access of W 600 X H 2000mm must be provided to the lift control cabinet.

ELECTRICAL:  Provide electrical supply to the Lift Cabinet and terminate to a lock off isolator, to the Easy Living Home Elevators lift sub-board. 32 Amp three phase dedicated supply is required.
 - Lift supply cabling by electrical contractor.
 - Wiring to comply with AS3000 requirements. 

LIGHTING:  Provide 24hr access lighting to the lift control drive cabinet.

PHONE POINT:  Provide single separate telephone point to the lift controller drive cabinet.

LANDING DOORS:  By Easy Living Home Elevators.

DOOR  FINISHING:  Door finishing by builder.

LANDING BUTTON:  Landing buttons are typically located within the frame but if installed onto a wall, the landing button finishing is by builder.

ACCESS KEY SAFE:  Builder to provide suitable location, Easy Living Home Elevators will supply and install an access key safe, to permit 24 hour access in the event of a lift fault. Final location to be confirmed by Easy Living Home Elevators.

STORAGE AREA:  Provide dry, clean and safe storage of the lift equipment on site. The location of the storage area shall be agreed with Easy Living Home Elevators and be close to the lift shaft and machine room.

STORAGE:  Should the site not be ready for the installation works to commence upon equipment arrival, storage costs will apply.

SCAFFOLDING:  Lift shaft scaffolding to be supplied to Easy Living Home Elevators specifications.

MAKING GOOD: For masonry shafts, building in and/or making good to lift doorframes, penetrations, floor sills and landing panels.

BUILDERS LIFT:  There is no provision for the lift to be used as a builders lift.

BINS:  Bins to be supplied for rubbish removal.

 

Note: Easy Living Home Elevators Pty Limited reserves the right to make changes to the above information at any time, without notice.